Case Study: M&E Design and Installation


Scope of Works:

  • Act as Principle contractor
  • To design and install new high bay bus bar electrical distribution
  • To design and install Gas heating system and strat fans
  • To design and install new electrical distribution containment
  • To design and install high bay lighting system
  • To design and install all emergency lighting system and escape strategy
  • To supply and install industrial floor coverings and epoxy floor paint
  • To design, supply and install new external compressor housings
  • To design and install new hard standings for external specialist gasses
  • To supply and install new fencing and safety segregation areas
  • To Supply and install new access control system


Location: Derbyshire

Duration: 25 Weeks

Value: £1.5m


   

   

                                     

   