Case Study: Steel Framed Extension


Scope of works:

    • Act as Principle contractor
    • To develop the planning application with the local authorities
    • To extend the existing paint shop facility to remove the hazard risks from the local area
    • To prepare the sub floor and ground in preparation for a new single story steel frame paint mixing area
    • To supply and install a suitable steel framed structure to seamlessly extend current facility and to ensure clients facility is within planning application guideline
    • To link the steel structure to the existing building and match the external aesthetics
    • To supply a clean room environment with explosion venting and IP65 lighting
    • To ensure all works satisfy FM Global requirements


    Location: Buckinghamshire

    Duration: 7 Weeks

    Value: £75k

            

        

        